Health Club

Munich, DE

  • Construction time: 4 months
  • Surface: 1.200 m²

Initial situation – particular feature

Former textile factory should be converted into a sports center.

Location plot

City center of Munich in an urbanistic industrial environment.

Design idea

Sandblasted exposed concrete surfaces, industrial glass partition walls, heavy, high-ceilinged sheet steel doors, open wiring and ceiling-punched reinforced concrete staircases stand for the concept, which is characterized by great individuality and that of conventional ones.