Design of the master plan with refurbishment and modernization stages of indoor swimming pool, outdoor swimming pool, saunas and hotel gastronomy are coordinating the technical and structural procedures. Implementation of all refurbishment and modernization measures is to be planned in such a way that the guests and users of the non-affected factories are affected as little as possible.
The topography of the western sloping slope site with various plateaus, visual references, and mountain panorama have been analyzed and implemented most precisely with regard to utility groups. This is particularly evident in the design of the exterior space. The development of a modern individual, location-specific, spa and wellness facility that supplements and strengthens the existing offer for hotel and congress guests, physiotherapy and fitness customers.