Sports Aquatic Center

Burghausen, DE

  • Construction time: 9 months
  • Built space: 28.000 m³
  • Water area indoor: 900 m²
  • Water area outdoor: 160 m²

Initial situation – particular feature

The existing Olympic sports swimming pool with swimming pool complex should be completely refurbished technically and structurally. Additionally be provided with a new color and material design. The expansion new building should be designed with uses such as family adventure water landscape indoor and outdoor sauna landscape and new catering.

Location plot

Park-like inner city location in the sports park area of Burghausen embedded in historical trees.

Design idea

The organic extension with a family adventure pool and a new sauna was designed as a link between the Olympic sports swimming pool and the outdoor pool. This reorganization with a public thoroughfare caused an attraction and reorientation of the entire leisure facility.